
Key Pre-Delivery Activities iii
Cat. No. 01021819
Pre-Delivery Activity: Prepare and Flush Water Treatment Components
All RO Membranes will require a 24-hour flush to drain. All flushing of mem-CAUTION!
branes and filters must be done with chlorine-free, filtered, softened water.
Activity Aqua-Cleer
®
CC Basic™
Filter
Aqua-Cleer
®
CC Basic™ RO
Aqua-Cleer
®
CC Basic™ LC-
100 RO
Aqua-Cleer
®
CC Basic™
AC50 RO
Flush the filters to drain for at least five (5)
minutes with filtered soft water
c
Verify that system includes Automatic
Shut-Off Valve (01021587)
c c
Verify that system includes Check Valve
(01021588)
c c
Verify system includes Air Gap (44403001
or equivalent) for system drain
c c c
Flush the RO cartridge to a drain with fil-
tered softened water for 24 hours prior to
installation
c c c
Flush the carbon block filter to drain for
at least five (5) minutes until there are no
more carbon fines observed.
c
Activate the Preferred Series 250 car-
tridge and thoroughly flush per the detailed
instructions
c
Flush the pre-carbon filter and sediment
filters to drain
c
Flush the carbon post filter to drain
c c c
Sanitize and flush the storage tank
c c c
Pre-Delivery Activity: Prepare and Flush POU Cooler for Service
Activity Aqua-Cleer
®
CC Basic™ POU
Cooler
Unpack the POU Cooler.
c
Inspect the POU Cooler for any shipping damage.
c
Flush and test the POU Cooler.
c
Comentarios a estos manuales